Worldmark Birch Bay Resort

Date Completed: September 8, 2018

10yr-100 room renovation to include: full tile, cabinets, tops, carpet, paint, ff&e, windows and coverings, deck re-coat with poly urea, deck railings, pool surfaces, ADA, corridors, lobby. Additionally identified structural damage to decks and did structural repair on the fly.